
A two-level Apple Cabin concept for projects that need more usable area on a compact footprint, subject to project-specific structural, stair and fire-safety design.
This Apple Cabin should be planned as a complete project rather than selected from appearance alone. Define the users, rooms, furniture, bathroom, kitchen or commercial equipment before the floor plan is approved. View direction, privacy, housekeeping, maintenance and local climate also affect the final configuration.
Coordinate guest capacity, sleeping zones, bathrooms, luggage, view direction, privacy and housekeeping access.
Define bedrooms, living, kitchen, storage and utilities after checking planning and occupancy rules.
Plan customer flow, counters, equipment, branding, accessible circulation and staff working areas.
| System | Confirm before production |
|---|---|
| Dimensions and structure | Final size, weight, loads, corrosion protection, lifting points and foundation reactions |
| Floor plan | Rooms, occupancy, furniture, storage, bathroom, kitchen and circulation |
| Envelope | Exterior finish, insulation, condensation control, glazing, shading and privacy |
| Utilities | Voltage, sockets, HVAC, hot water, plumbing, drainage and data |
| Site | Access, unloading, crane reach, foundations, drainage and service locations |
| Compliance | Structural, fire, energy, electrical, plumbing, accessibility and occupancy requirements |
All listed sizes, areas and layouts are planning references where stated. Final dimensions, weight, materials, equipment, performance, price and delivery method are defined by the approved quotation and drawings.
Exterior color, interior surfaces, glazing, bathroom fixtures, kitchen equipment, furniture, lighting and selected systems can be quotation-specific. For multiple units, approve one coordinated specification and sample schedule so guest rooms or commercial spaces remain consistent.
Confirm the transport route, packed dimensions, unloading space and lifting plan before shipment. Complete approved foundations, drainage and utility points before arrival. Local planning, structural, fire, electrical, plumbing, energy, accessibility and occupancy rules may apply; consult qualified local professionals and authorities before production.
Yes. Rooms, openings, finishes, furniture and selected equipment can be configured for a defined order, subject to technical review.
They can be quoted where the chosen plan allows. Confirm fixtures, ventilation, hot water, electrical loads and connection positions before production.
Approval is jurisdiction and project specific. Send the applicable requirements for review and use qualified local professionals for permitting and final connections.
Size, quantity, structure, finishes, glazing, bathroom, kitchen, furniture, equipment, electrical standard, packaging and destination affect the quotation.
Send your destination, use, quantity, room requirements and site information for a project-specific layout and quotation.
At Huisheng, we believe that professional focus creates trusted quality.
+86 17563695938
contact@hshouse.com
No. 1099, Gongye 1st Street, Weicheng District, Weifang City, Shandong Province, China
View on Mobile
Copyright © 2026 Huisheng International Trade All rights reserved
Send us your requirements. Free custom floor plan or 3D design in 3 working days
Submit form